Saturday 4 May 2019

D/W PERT &cpm

     THE DEFFEREN  B/W PERT & CPM 


       
           
     

    Project management can be understood as a systematic way of planning, scheduling, executing, monitoring, controlling the different aspects of the project, so as to attain the goal made at the time of project formulation. PERT and CPM are the two network-based project management techniques, which exhibit the flow and sequence of the activities and events. Program (Project) Management and Review Technique (PERT) is appropriate for the projects where the time needed to complete different activities are not known.


   

Definition of PERT

PERT is an acronym for Program (Project) Evaluation and Review Technique, in which planning, scheduling, organizing, coordinating and controlling uncertain activities take place. The technique studies and represents the tasks undertaken to complete a project, to identify the least time for completing a task and the minimum time required to complete the whole project. It was developed in the late 1950s. It is aimed to reduce the time and cost of the project.
PERT uses time as a variable which represents the planned resource application along with performance specification. In this technique, first of all, the project is divided into activities and events. After that proper sequence is ascertained, and a network is constructed. After that time needed in each activity is calculated and the critical path (longest path connecting all the events) is determined.

Definition of CPM

Developed in the late 1950s, Critical Path Method or CPM is an algorithm used for planning, scheduling, coordination and control of activities in a project. Here, it is assumed that the activity duration is fixed and certain. CPM is used to compute the earliest and latest possible start time for each activity.
The process differentiates the critical and non-critical activities to reduce the time and avoid the queue generation in the process. The reason for the identification of critical activities is that, if any activity is delayed, it will cause the whole process to suffer. That is why it is named as Critical Path Method

Conclusion

The difference between these two project management tools is getting blurred as the techniques are merged with the passage of time. That is why, in most projects, they are being used as a single project. The primary point that distinguishes PERT from CPM is that the former gives the extreme importance of time, i.e. if the time is minimized, consequently the cost will also be reduced. However, cost optimization is the basic element, in the latter.
            *****

No comments:

Post a Comment

Types of arrays

What is arrays :                               An array is collection of elements where all the elements are same data type and under the ...